{"id":770,"date":"2026-11-19T14:14:32","date_gmt":"2026-11-19T06:14:32","guid":{"rendered":"http:\/\/www.dominiglasscentre.com\/blog\/?p=770"},"modified":"2026-11-19T14:14:32","modified_gmt":"2026-11-19T06:14:32","slug":"how-to-handle-lsr-material-in-vertical-injection-machines-4b3d-8391a8","status":"publish","type":"post","link":"http:\/\/www.dominiglasscentre.com\/blog\/2026\/11\/19\/how-to-handle-lsr-material-in-vertical-injection-machines-4b3d-8391a8\/","title":{"rendered":"how to handle LSR material in vertical injection machines"},"content":{"rendered":"<p>If you\u2019re a molder working with liquid silicone rubber (LSR) on vertical injection molding machines, you know the material is equal parts versatile and unforgiving. I\u2019ve spent 12 years in the machinery supply business, walking alongside production teams across automotive, medical, and consumer goods shops, and every story I hear comes down to one truth: LSR isn\u2019t like thermoplastics. Its low viscosity, fast cure, and sensitivity to contamination mean even small missteps can derail runs, waste material, and delay shipments. As someone who helps molders source, set up, and troubleshoot vertical LSR machines, I\u2019ve seen first-hand how mastering LSR handling on vertical equipment doesn\u2019t just fix immediate issues\u2014it cuts long-term costs and improves part consistency. Let\u2019s break down the key moves that actually work, not the generic advice you\u2019ll find in a manufacturer\u2019s manual. <a href=\"https:\/\/www.baizanplast.com\/vertical-injection-molding-machine\/lsr-vertical-injection-molding-machine\/\">LSR Vertical Injection Molding Machine<\/a><\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.baizanplast.com\/uploads\/47357\/small\/fixed-platen-lsr-injection-moulding-machineb733e.jpg\"><\/p>\n<p>First, let\u2019s start with pre-run prep, because with LSR, 80% of problems are solved before you hit the injection button. Vertical machines have a few quirks that make pre-run checks different from horizontal units, and those quirks trip up even veteran molders. For starters, LSR is a two-part material\u2014Part A (base silicone) and Part B (curing agent)\u2014that must be mixed at a precise 1:1 ratio. Most vertical LSR machines come with static mixers, but here\u2019s the mistake I see: molders either skip purging the mixer before a run, or they let the mixed LSR sit in the barrel too long. LSR starts curing at room temperature, so a partially used mixer that\u2019s been sitting for 30 minutes will have early-cured silicone particles that contaminate the next batch. Last year, a medical device molder I work with scrapped 2,000 faulty parts because they didn\u2019t purge a 12-inch static mixer before switching from a different LSR grade. The solution? For vertical machines, always install a new static mixer for every job change, and run 2\u20133 barrels of LSR through the mixer before starting production. That flushes out residual contamination and ensures ratio consistency.<\/p>\n<p>Another pre-run step that\u2019s easy to overlook on vertical machines: the barrel temperature. Unlike thermoplastics, which need high heat to melt, LSR only needs to stay above 20\u00b0C (68\u00b0F) to stay workable\u2014but never above 40\u00b0C (104\u00b0F). Heat it any higher, and the material cures prematurely in the barrel, leading to short shots, burn marks, or even stuck plungers. Vertical machines, especially older models, can have uneven heat distribution because their barrels are oriented vertically\u2014warm air rises, so the top of the barrel might be 5\u00b0C hotter than the bottom. I recommend adding a secondary, low-profile temperature sensor mounted at the middle of the barrel to catch this discrepancy. A client in Austin used to have 15% scrap on small LSR O-rings until we added that sensor; their scrap dropped to 2% overnight. That\u2019s the kind of small, targeted adjustment that moves the needle.<\/p>\n<p>Next, injection and mold handling\u2014where vertical equipment\u2019s vertical orientation is both an advantage and a risk. On vertical machines, the mold sits above the injection unit, so gravity works for you in terms of material flow into the cavity, but it also means any drip from the nozzle can land on the mold or the machine\u2019s base, leading to contamination. Let\u2019s talk injection pressure first. LSR\u2019s low viscosity means you don\u2019t need the high pressures you\u2019d use for hard plastics\u2014usually 500\u20131,500 psi, depending on part size. But here\u2019s the catch: vertical machines often have longer nozzles than horizontal units, because the injection unit sits directly below the mold. A long nozzle that\u2019s not properly heated can cause the LSR to cool too quickly mid-injection, leading to incomplete cavity fill. I advise insulating the vertical nozzle with a high-temperature fiberglass wrap to maintain a consistent 25\u201330\u00b0C (77\u201386\u00b0F) surface temperature. That simple addition fixed a recurring issue for a San Diego molder who made LSR keypads for consumer electronics; they used to have 10% \u201cpartial fill\u201d keypads until they wrapped the nozzle.<\/p>\n<p>Then there\u2019s the mold venting, which is non-negotiable for LSR. LSR cures fast, so any air trapped in the cavity will leave voids or sink marks. On vertical machines, the mold\u2019s parting line is horizontal, so vents need to be machined along the bottom edge of the cavity (where air rises and gets trapped). The ideal vent depth for LSR is 0.02\u20130.03 mm\u2014any deeper, and the LSR will flash onto the mold, requiring manual trimming; any shallower, and air won\u2019t escape. I recently worked with a molder who was venting at 0.05 mm and spending 2 hours per shift trimming flash from LSR gaskets. After we adjusted the vents to 0.025 mm, trimming time dropped to 15 minutes per shift. It\u2019s also important to clean vents after every run: LSR cures into a hard rubber that can clog vents, so a 10-minute post-run vent wipe with isopropyl alcohol prevents next-run issues.<\/p>\n<p>Curing is the final step, and this is where vertical machines really shine if you set them up right. Vertical machines use clamp forces that are often easier to calibrate than horizontal units for LSR, because the mold is held closed vertically with uniform pressure across the parting line. But here\u2019s the rule: cure time depends on part thickness, not just machine temperature. LSR cures at 180\u00b0C (356\u00b0F) for thin parts, but for a 5 mm thick part, you\u2019ll need 10\u201315 seconds of cure time. Over-curing is a waste\u2014you\u2019re extending cycle time and wearing out the mold faster\u2014and under-curing leads to parts that are too soft and don\u2019t pass industrial strength tests. A key tool here is in-mold sensors: many newer vertical LSR machines come with pressure or temperature sensors that trigger the mold to open as soon as cure is complete. Last year, a client in Detroit switched from time-based curing to sensor-based curing, cutting their cycle time by 12% without sacrificing part quality. That\u2019s a big win for throughput.<\/p>\n<p>Now, let\u2019s talk about the big hidden danger with LSR on vertical machines: contamination. Even a speck of dust, a thread from a shop rag, or a leftover piece of cured silicone from a previous run can ruin an LSR part, especially for medical or food-grade applications. Vertical machines have open access to the mold because of their orientation, which makes contamination more likely than with enclosed horizontal machines. So what\u2019s the fix? First, implement a \u201cno loose parts\u201d rule on the shop floor near the vertical machine: no jewelry, no rags hanging over the mold, no food or drinks within 10 feet. Second, always use LSR-specific purge compound when switching materials, not general-purpose thermoplastic purge. LSR purge is designed to dissolve cured silicone without damaging the static mixer or nozzle. Third, if you\u2019re running medical-grade LSR, invest in a small air filtration unit near the mold to trap airborne particles. I\u2019ve seen a molder lose a $50,000 medical contract because a single piece of lint got into a batch of LSR catheters\u2014so this isn\u2019t just a \u201ccleanliness thing\u201d; it\u2019s a business thing.<\/p>\n<p>I also want to address a common question I get: what about regrind? A lot of molders want to reuse LSR scrap, but here\u2019s the thing: LSR can\u2019t be melted down and reprocessed like thermoplastics. Any scrap from LSR runs should be discarded\u2014recycling cured silicone isn\u2019t feasible for most production runs. The only exception is small amounts of flash, which can be ground up and added back to new LSR at a 5% maximum rate, but only if your material supplier approves it. Adding more than that throws off the A\/B ratio and cures unevenly. I always tell molders to budget for 10\u201315% scrap when quoting an LSR job, and that includes flash, off-cuts, and test parts\u2014being realistic about this avoids cutting corners that lead to bad parts.<\/p>\n<p>At the end of the day, working with LSR on vertical injection machines comes down to consistency. It\u2019s not about buying the most expensive machine, or following every step in a manual word-for-word. It\u2019s about small, intentional checks: checking the barrel temperature before every run, purging the static mixer, calibrating the vents, and keeping contamination out. I\u2019ve seen molders go from 25% scrap to 2% just by adding two minutes of pre-run prep per job. That\u2019s the kind of gain that adds up to thousands in savings every month.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.baizanplast.com\/uploads\/47357\/small\/c-frame-vertical-injection-molding-machine726f3.png\"><\/p>\n<p>If you\u2019re currently running LSR on vertical machines and dealing with persistent issues\u2014whether it\u2019s high scrap, inconsistent part quality, or long cycle times\u2014I can help. We work with production teams to calibrate existing equipment, train operators on LSR-specific handling, and source vertical injection machines built exclusively for LSR. We don\u2019t do generic solutions; we work with your specific parts, your production goals, and your shop\u2019s setup to cut waste and improve throughput. Reach out to our team to discuss your LSR vertical molding needs\u2014we\u2019re here to help you get it right.<\/p>\n<p><a href=\"https:\/\/www.baizanplast.com\/specific-vertical-injection-moulding-machine\/\">Specific Vertical Injection Moulding Machine<\/a> References:<\/p>\n<ol>\n<li>International Organization for Standardization (ISO) 10993-5, Biological Evaluation of Medical Devices &#8211; Part 5: Tests for In Vitro Cytotoxicity<\/li>\n<li>Society of Plastics Engineers (SPE) Molding Division, Liquid Silicone Rubber Molding Handbook, 2021<\/li>\n<li>Vergano, P.J., et al. \u201cCuring Kinetics of Addition-Cure Liquid Silicone Rubber,\u201d Journal of Applied Polymer Science, vol. 122, no. 4, 2011, pp. 2562-2570<\/li>\n<li>American Society for Testing and Materials (ASTM) D4708, Standard Test Method for Compression Set of Rubber Materials<\/li>\n<li>Manufacturing Engineering and Technology Society, \u201cContamination Control in Liquid Silicone Rubber Molding,\u201d 2022.<\/li>\n<\/ol>\n<hr>\n<p><a href=\"https:\/\/www.baizanplast.com\/\">Guangdong Baizan Intelligent Equipment Co., Ltd.<\/a><br \/>We are one of the most professional lsr vertical injection molding machine manufacturers and suppliers in China. We warmly welcome you to buy customized lsr vertical injection molding machine at competitive price from our factory. If you have any enquiry about pricelist and quotation, please feel free to email us.<br \/>Address: No.8, Jianye Road, Dahuai Town, Enping City, Jiangmen City, Guangdong<br \/>E-mail: wjx@baizanjx.com<br \/>WebSite: <a href=\"https:\/\/www.baizanplast.com\/\">https:\/\/www.baizanplast.com\/<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>If you\u2019re a molder working with liquid silicone rubber (LSR) on vertical injection molding machines, you &hellip; <a title=\"how to handle LSR material in vertical injection machines\" class=\"hm-read-more\" href=\"http:\/\/www.dominiglasscentre.com\/blog\/2026\/11\/19\/how-to-handle-lsr-material-in-vertical-injection-machines-4b3d-8391a8\/\"><span class=\"screen-reader-text\">how to handle LSR material in vertical injection machines<\/span>Read more<\/a><\/p>\n","protected":false},"author":189,"featured_media":770,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[733],"class_list":["post-770","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry","tag-lsr-vertical-injection-molding-machine-48ee-83c59f"],"_links":{"self":[{"href":"http:\/\/www.dominiglasscentre.com\/blog\/wp-json\/wp\/v2\/posts\/770","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.dominiglasscentre.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.dominiglasscentre.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.dominiglasscentre.com\/blog\/wp-json\/wp\/v2\/users\/189"}],"replies":[{"embeddable":true,"href":"http:\/\/www.dominiglasscentre.com\/blog\/wp-json\/wp\/v2\/comments?post=770"}],"version-history":[{"count":0,"href":"http:\/\/www.dominiglasscentre.com\/blog\/wp-json\/wp\/v2\/posts\/770\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/www.dominiglasscentre.com\/blog\/wp-json\/wp\/v2\/posts\/770"}],"wp:attachment":[{"href":"http:\/\/www.dominiglasscentre.com\/blog\/wp-json\/wp\/v2\/media?parent=770"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.dominiglasscentre.com\/blog\/wp-json\/wp\/v2\/categories?post=770"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.dominiglasscentre.com\/blog\/wp-json\/wp\/v2\/tags?post=770"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}